<rt id="eqeyq"><delect id="eqeyq"></delect></rt><rt id="eqeyq"><tr id="eqeyq"></tr></rt>
  • <rt id="eqeyq"></rt><abbr id="eqeyq"></abbr>
    <button id="eqeyq"><input id="eqeyq"></input></button>
    <bdo id="eqeyq"></bdo>
    <table id="eqeyq"></table>
    好獵頭網-中高級人才獵頭網站!服務熱線:400-1801-668 好獵頭   |   登錄 注冊

    CONTRACT FOR PROCESSING

    添加時間:2017-11-26 23:59:50
    瀏覽次數: 0
      messrs: _________________________________
        industry ltd. (hereinafter called party a)
      and
      industry ltd. (hereinafter called party b)
      have agreed that party b shall manufacture standard magnetic
      compasses in____________ with all necessary parts and materials supplied by party a under the following terms and conditions:
      1. commodity and quantities for processing with supplied materials and assembling with supplied parts:
      (1) commodity-standard magnetic compass;
      (2) quantity-____________sets in total.
      2. all necessary parts and materials listed in the contract shall either be supplied by party a or purchased in ____________ or by party b;
      3. the processing charge for each model is as follows:
      (1) standard magnetic compass of type glc-1 at u. s. $
      ____________(say: _________________u. s. d) each;
      (2) standard magnetic compass of type glc-2 at u. s. $
      _____________(say: ________________ u. s. d) each;
      (3) standard magnetic compass of type glc-3 at u. s. $
      ____________(say: ___________u. $. d) each.
      4. the main parts, consumables and materials required for processing will be sent to (place) by party a and if there is any shortage or damage, party a should be held responsible for supplying replacements;
      5. party a should pay party b by l/c or t/t covering the full amount of processing charges and costs of parts, consumables and materials purchased in__________or____________by party b one month before shipment of the finished products;
      6. party b must complete the manufacturing of all standard magnetic compasses of type glc-1 and effect shipment within the agreed date without delay except in the occurrence of uncontrollable and unforceeable events ;
      7. the damage rate of parts and materials:
      the damage rate of parts and materials in processing is __________% and such a damage rate of parts and materials shall be supplied free by   party a, should the damage rate exceed _____________ % , party b shall supply additional materials
    and necessary parts;
      8. should shipment of materials and parts sent by party a be wrong or in excess, party b shall return the excessive portion at the expense of party a, in case of short shipment, party a shall make up the shortage;
      9. all parts and materials supplied by party a for standard magnetic compasses shall be processed by party b strictly in accordance with the design without any modification;
      10. technical service:
      party a agrees to send technicians to______________to help training party b,s technicians at the request of the latter at any time and allows the technicians to remain with party b for inspection of the finished products. in such case, party b agrees to pay a monthly salary of u. s. $ ____________ for each person, all other expenses (including roun d trip tickets) will be borne by party a;
      11. all import and export formalities in connection with this contract should be handled by party b;
      12. all standard magnetic compasses processed by party b shall be shipped to the foreign buyers appointed by party a at any
    time;
      13. other terms and conditions:
      (1) the trade marks of standard magnetic compass shall be supplied by party a, should there be any legal dispute, party a shall be held fully responsible;
      (2) the quality of parts and materials, if necessary, purchased in__________ or_____________ by party b for standard magnetic compasses must measure up to standard and be approved by party a beforehand;
      (3)for promotional purposes, party b shall prepare samples of standard magnetic compass at any time and send them to foreign buyers appointed by party a , all parts
    and materials required would be supplied out of the stock supplied by party a;
      14. this contract shall be made in triplicate, party a and party b shall, both signing all copies, retain one copy and submit one to authorities concerned in (place) for registration.
      industry ltd.   industry ltd.
      ________            ____________
      manager             manager 
    主站蜘蛛池模板: 临安市| 江津市| 读书| 玉环县| 景泰县| 永昌县| 桃园县| 宝丰县| 县级市| 广水市| 车致| 台南市| 灌南县| 青冈县| 南召县| 工布江达县| 肇庆市| 建始县| 尼木县| 三明市| 开江县| 丹阳市| 黎川县| 布拖县| 宁武县| 广州市| 平顶山市| 古田县| 潼关县| 霍州市| 绥棱县| 西乌珠穆沁旗| 枣强县| 虎林市| 江山市| 新乐市| 开原市| 元阳县| 崇明县| 称多县| 利川市|